SLS on the move

NASA’s Crawler-Transporter 2 (CT-2) did the heavy lifting of the heavy-lift rocket, traveling 4 miles to the launch pad. The crawler moves at less than a mile per hour and has a loading capacity of 18 million pounds.

NASA’s Crawler-Transporter 2 (CT-2) did the heavy lifting of the heavy-lift rocket, traveling 4 miles to the launch pad. The crawler moves at less than a mile per hour and has a loading capacity of 18 million pounds.